HZS35 Portable Concrete Batching Plant Installed in Costa Rica
Project Overview
- Plant Model: AG-YHZS35 (portable, chassis mounted)
- Capacity: 35 m³/h rated, 0.75 m³ per batch, 72 s cycle
- Mixer Type: JS750 twin-shaft, 3.8 m hydraulic discharge
- Application: A road or a small hydro job
- Delivery Time: 28 days
- Installation Time: on a flat concrete slab, 7–9 days
Customer Background
Customer Requirements
- Move with the job. The HZS35 concrete plant had to fit on a truck and follow the crew from site to site, without a full dismantling job each time.
- Stand on a slab, not a foundation. No piles, no deep concrete, just a flat pad that can be poured in a day.
- No crane on site. The frame had to stand up on its own legs, because a crane is expensive and hard to book in remote areas.
- Keep running in the rain. Sealed cabinets, covered bins, a dust collector on the silo, and steel that stays off the mud.
- Right weights, every batch. Cement is the costly part of the mix, so the cement scale had to hold ≤1%.
- One man on the panel. A simple control screen the operator can learn in a day, with a manual mode for cleaning and small adjustments.
- Parts and training, not just steel. Installation and debugging, operator training, and spare parts that can be shipped later.
AGICO Customized Solution
- A plant on wheels — The mixer, the bins, and the belt share one chassis. The wheels carry air brakes for the road, and the support legs take over when the plant is working. Moving it is a transport job, not a construction job.
- JS750 twin-shaft mixer — Two shafts turn against each other, so 0.75 m³ is mixed in 72 seconds. The shaft runs an anti-bonding design, and the blades and arms are high-chromium, high-manganese alloy, which matters when the aggregate is hard.
- PLD1200 aggregate batcher — Three to four bins, 3.5 m³ of storage and 1200 L of weighing capacity. Each bin has its own pneumatic door, and the buffer in the scale keeps the reading steady while the belt is running.
- Belt feed with anti-blocking — A 500 mm belt with a 3 kW drive lifts the aggregate to the mixer. The belt frame carries the AGICO CEMENT mark, and the skirt keeps wet aggregate on the belt instead of on the ground.
- Cement kept dry — The silo is a 2 × 60 t detachable type, with a dust collector, a level monitor, and a pressure relief valve. A screw conveyor moves the cement to the scale; ø219 mm and ø273 mm sizes are both available, cut to the length the layout needs.
- Control that one man can run — PLC plus PC, one screen, one button to start a batch. Recipes are stored, each batch is recorded, and a manual mode is there for cleaning and for the first test run. Semi-automatic and manual panels are cheaper options if the budget is tight.
- Dust where it belongs — The ingredient system is closed, and the silo top carries a dust collector. In a wet climate, this also keeps rain out of the powder.
- Wired and tested before shipping — Every cable is terminated at the AGICO works, and the plant runs for two to three days before it is packed. On site, the crew connects power and air instead of building a machine from parts.
Installation Process
On site the job is short. The chassis is pulled onto the slab, the four legs are lowered and pinned, and the frame is levelled with the jacks. The mixer, the belt and the bins are already on the frame. The cables are already in the junction boxes. The crew brings power and air to the plant, runs it empty, checks the scales, and the first batch follows.
AGICO quotes 7 to 9 days for a mobile concrete batch plant like this one. A stationary plant of the same size needs 14 to 21 days, because it has to be built up on the site. There is also no crane in the plan: the frame stands up on its own legs, and the mixer is already sitting on its platform when the plant arrives.
The slab is what matters in Costa Rica. A flat, level concrete pad keeps the legs out of the mud when it rains and keeps the frame square, which the scales need.


Project Results
- Daily Output: 0.75 m³ per batch, 72 seconds per cycle. A truck is loaded without a long wait, and a short shift still covers a small project.
- Labor Cost: One operator at the panel, one man on the truck. The plant does not need a crew of fitters to keep it running.
- Mixing Efficiency: The twin-shaft mixer works the batch from both sides, so 0.75 m³ is ready in 72 seconds. The anti-bonding shaft keeps the drum clean between batches.
- Product Quality: Cement and fly ash are weighed to ≤1%, aggregate to ≤2%, and each material has its own scale. The mix follows the recipe, not the operator's eye.
- ROI Period: The plant sits in the 25 , 000 – 25,000–50,000 band. On a steady contract it pays for itself in roughly 12 to 18 months; send us your contract volume and local concrete price and our engineers will work out your own figure.
Customer Feedback
“We move with the work, so the plant has to move too. This one came on one frame, stood on its own legs and was making concrete in the first week. The rain is the real test here, and the cabinets and the silo have stayed dry through two wet seasons.” — Customer, Costa Rica